Completed Projects

The test machine project, whose design was initiated early in 2010 by the Engineering and R&D Department, and in which numerous engineering and technical staff took part in, was completed towards the end of 2010, after which test studies commenced. Tests were carried out at the specially designed test room. This machine shall help assess the performance, the maximum load, and maximum operating temperatures of new products awaiting mass production. In addition, received customer complaints shall be evaluated to produce numerical results.



Revision and capacity increase studies were conducted on operating machines in order to increase their efficiency.